Step 4 – Plumbing

16Apr13

There are two spots in my basement with a need for water. The wet bar and the bathroom. The wet bar needed hot and cold water, a drain, and a drinking water line.

The bathroom was stubbed out by the builder. So….the drains were there….but we didn’t like the drain for the shower. We cut it out.

2011-09-29_11-42-53_713

2011-09-29_14-37-33_775

The bathroom also needed hot and cold water to the sink and the shower and also cold water to the toilet.

I used 1/2″ PEX throughout with the exception of the drinking water line from my R/O unit to the basement refrigerator  For this I used a 3/8 PEX line to keep the volume stored in the line to a minimum and hopefully help pressure loss.

<insert picture of tap of 3/8″ line from R/O tank>

Advertisements


No Responses Yet to “Step 4 – Plumbing”

  1. Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: